Operational use and control system for high pressure reactor

The high pressure reactor is a kind of chemical reactor vessel, in which the controller plays an important role in the reaction. The electronic components of the stirring control circuit are assembled on a circuit board, and the double closed loop control system has high speed regulation precision. The speed is stable and the anti-interference ability is strong.

The outer casing of the high-pressure reactor is a standard aluminum alloy case, and the upper cover can be pulled back for maintenance and maintenance. The panel is equipped with a temperature digital display, a voltmeter, a tachometer, and control switches and adjustment knobs for the operator to operate. All external leads are led out from the rear panel through the waterproof connector from the terminals in the controller.

The heating circuit of the high-pressure reactor uses a solid-state relay to regulate the pressure, so that the heating circuit tends to be simplified. The heating power can be adjusted by adjusting the “pressure regulation” knob. At the same time, the control part of the heating circuit is equipped with an intelligent digital display to make it The heating temperature is freely regulated according to the requirements of the process, and the temperature control accuracy is extremely high.

In the process of operation, the high pressure reactor needs to constantly listen to the abnormal vibration and sound in the reaction kettle. Check to some extent whether all the inlet and outlet valves of the reactor are in good condition. If there is any problem, it must be treated in time; Whether the bolts are loose or not, and the safety guard is intact and reliable.

High-pressure reaction kettle check safety valve, explosion-proof membrane, pressure gauge, thermometer and other safety devices are accurate and sensitive, safety valve, pressure gauge has been verified, and the seal is intact, the red line of the pressure gauge is correct, and the explosion-proof membrane is inside. leak.


Post time: Jun-18-2019